Categories
Announcements

Canal barrier operational

canal barrier

The replacement canal barrier is installed and operational. Access control procedures are in place in accordance with policies implemented from January 1, 2014 and each boat moored inside the residential community requires a permit. The height of the bridge at the canal entrance is 14′ at high tide and 17’5″ at low tide. The draft is typically between 2′ and 4′ at low tide.

For further details about obtaining a permit, visit this help desk topic.

Leave a Reply

Your email address will not be published. Required fields are marked *

Supported By WordPress Support Desk

Supported By 24x7 WP Official HelpDesk